By L8MS Team · Updated 4 Sep 2026
Remedial Actions in the site menu lists the physical jobs raised against the open site — from non-conforming results or added directly.
Steps
Use the filter to scope the list (status, date, type).
Site remedial actions. — screenshot pending
Open a remedial to record progress — a note, a job number, a target date.
When the work is done, set it to a completed / authorised status. It then drops off the outstanding list and the planner chip.
Opened from the plannerThe Remedials chip on the site planner opens this same list already filtered to what is outstanding.